สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
Steel structures engineered for Thailand, built to world standards
100+ steel buildings already standing across Thailand
2,000 tonnes a month from a 20,000 m² factory
Clear spans to 90 m, crane buildings and mezzanines
High-tensile galvanised purlins, cut and punched per building
Intumescent fire protection – only where it is needed
Paint systems for Thailand’s climate – with TOA and the brands you trust
3–5 days at sea to Laem Chabang – or DDP to your site
From the EEC to Isan and the South – we deliver to every province

Structural steel · PEB · Purlins – delivered to Thailand

Steel structures engineered for Thailand, built to world standards

World Steel designs and fabricates the steel frame and purlins of your warehouse, factory or commercial building, protects it with the right paint system and ships it CIF to a Thai port or DDP to your site. One certified partner, one price, one schedule.

  • 100+projects in Thailand
  • 2,000 tfabrication per month
  • CIF · DDPdelivery terms
01 / 09

One partner · one contract · one schedule

Consulting, design, fabrication and delivery – a complete solution for your steel project

You do not need four suppliers and four contracts. World Steel takes your project from the first sketch to steel standing ready at your site – so cost, quality and schedule are owned by one team.

  1. 01

    Consult

    We study your site, use, budget and Thai approvals, then recommend the building system that fits – before you spend on drawings.

    • Site & requirement review
    • Budget estimate in 48 h
    • Thai code & permit advice
  2. 02

    Design & VE

    Our engineers design the frame to Thai loads and value-engineer it for the lowest total cost, with Tekla models and drawings for your approval.

    • Structural design & calculations
    • Value engineering options
    • Shop & anchor-bolt drawings
  3. 03

    Fabricate

    Cutting, welding, blasting and painting in our 20,000 m² certified factory, with inspection records for every piece.

    • ISO 3834-2 · EN 1090 EXC3
    • TOA or specified paint systems
    • Fire protection to R120
  4. 04

    Deliver

    Packed in erection order and shipped CIF to a Thai port or DDP to your gate, with customs handled and an engineer on call for erection.

    • CIF / DDP to all 77 provinces
    • 3–5 days at sea
    • Erection support

One project manager from quotation to the last bolt – one price, one schedule, one responsibility.

Get a quotation
2012founded in Vietnam
2019first project in Thailand
100+projects delivered in Thailand
20,000 m²fabrication factory
2,000 tsteel per month
7international certifications

For every client, every project, every sector

The right steel partner for anyone who builds in steel

From a 500 m² farm shed to a 300-metre distribution centre, World Steel Thailand serves every kind of client – and our Value Engineering helps each of them build the same building for less.

Client groups

  • Investors & property developers
  • Manufacturers & foreign-invested (FDI) factories
  • Industrial estate operators
  • Logistics, 3PL & e-commerce operators
  • Retail, wholesale & convenience chains
  • Farmers, agribusiness & food processors
  • Design & build and general contractors
  • Consultants, architects & engineers
  • Steel fabricators & erectors
  • Government & public agencies
  • Schools, hospitals & communities
  • SMEs, shop owners & homeowners

Project types

  • Warehouses & distribution centres
  • Factories & manufacturing plants
  • Cold storage & food plants
  • Supermarkets & retail stores
  • Showrooms & offices
  • Multi-storey car parks
  • Aircraft hangars & wide-span buildings
  • Fresh markets & community halls
  • Sports halls & badminton courts
  • Rice mills, feed mills & farm buildings
  • Energy & solar plant buildings
  • Mezzanines & equipment platforms
  • Multi-storey steel buildings
  • Canopies, carports & walkways
  • Steel & pedestrian bridges
  • Extensions & re-roofing frames

Sectors

  • Logistics & e-commerce
  • Automotive & parts
  • Electronics & electrical
  • Food & beverage
  • Agriculture & feed
  • Retail & wholesale
  • Pharmaceutical & medical
  • Petrochemical & energy
  • Plastics & packaging
  • Aviation
  • Sports & leisure
  • Education & healthcare
  • Hospitality & tourism
  • Public infrastructure

Value Engineering · VE

Value Engineering: the same building, less investment

Before we quote, our engineers look for every baht that does not add strength or value – and show you the saving in tonnes and baht.

10–20%typical steel-weight saving against a conventional hot-rolled design
  1. 01
    Tapered built-up members

    Steel placed where the forces are – deep at the knee, slim at mid-span.

  2. 02
    Right frame & bay spacing

    We compare clear-span, multi-span and bay options to find the lightest layout for your use.

  3. 03
    Continuous lapped Z-purlins

    High-tensile G450/G550 purlins lapped over supports carry more with less steel.

  4. 04
    Smaller foundation loads

    Optimised bracing and pinned bases reduce column reactions – and the concrete under them.

  5. 05
    Fire paint only where needed

    Member-by-member fire design cuts intumescent thickness, often the biggest hidden cost.

  6. 06
    Fewer containers, faster erection

    Nested packing and erection-sequence bundles cut freight and crane time on site.

Welder inspecting a built-up steel beam at the World Steel factory
Painted steel members ready for inspection
100+projects in Thailand since 2019

Quality proven in Thailand

100+ Thai projects. One certified standard of quality.

Since 2019, more than 100 warehouses, factories, stores, markets and car parks across Thailand have been built on World Steel frames. Every one was fabricated, inspected and documented with the same certified process we use for projects in the United States and Australia – which is why Thai owners and contractors keep coming back.

Certified welding & fabrication

ISO 3834-2, EN 1090 EXC3, AS/NZS 5131 CC3 and IAS AC472 – audited by independent bodies, not self-declared.

Modelled in 3D, fit-checked

Every frame is modelled in Tekla and every connection checked before cutting, so bolts line up on your site the first time.

Inspected lot by lot

Dimensions, welds and paint thickness checked against an inspection and test plan, with records you can request for any member.

Delivered as documented

Piece marks, packing lists and erection drawings match each container, so your Thai erection team knows exactly what arrived.

  • ISO 3834-2
  • EN 1090 EXC3
  • AS/NZS 5131 CC3
  • IAS AC472
  • ISO 9001
See all certifications

Our factory

A 20,000 m² factory that works to your Thai schedule

Our own fabrication plant in Hai Son Industrial Park, Tay Ninh – opened in 2016, one hour from the deep-sea ports of southern Vietnam – produces 2,000 tonnes of structural steel every month. Because cutting, welding, blasting, painting and QA all happen under one roof, we give you a fabrication date and keep it. From the port, your steel reaches Laem Chabang in about 3–5 days at sea.

20,000 m²
covered fabrication area
2,000 t
structural steel per month
6
QC inspection stages per member
3–5 days
sailing to Laem Chabang
Aerial view of the World Steel factory, Hai Son Industrial Park
Aerial view of the World Steel factory, Hai Son Industrial Park
Main fabrication hall with overhead cranes
Main fabrication hall with overhead cranes
Automated beam welding line
Automated beam welding line
Members marked and sorted for shipment
Members marked and sorted for shipment
Painted steel packed for export to Thailand
Painted steel packed for export to Thailand

Key equipment

  • Automated beam welding line
  • Gantry beam welding machines
  • CNC plasma & gas cutting
  • Bodor fibre-laser cutting
  • CNC drilling & punching
  • Hydraulic cutting & shearing
  • Beam straightening machine
  • Shot blasting line
  • Industrial paint & intumescent coating bays

Raw steel from mills in Japan, Korea, Taiwan and Europe, every heat traceable to its mill certificate – EN 10204 3.1 available on request.

From approved drawings to your Thai site

  1. 1–3 weeksApproval drawingsGA, anchor bolts and reactions for your Thai engineer and permit
  2. 3–6 weeksFabrication & QACut, welded, blasted, painted and inspected in Tay Ninh
  3. 3–5 daysSea freightSouthern Vietnam to Laem Chabang, Bangkok, Map Ta Phut or Songkhla
  4. 3–7 daysCustoms & truckingWith DDP we clear Thai customs and deliver to your site

You get a confirmed fabrication plan and shipping date, with weekly progress updates – so your project schedule stays under your control.

Why Thai clients choose World Steel

Lower total cost. Less risk. A frame that fits on the first lift.

Optimised steel weight

Our engineers value-engineer every frame – tapered members, optimised bay spacing and lapped Z-purlins – so you pay for steel that works, not steel that sits.

Certified like few in Asia

ISO 3834-2 welding, EN 1090 EXC3, AS/NZS 5131 CC3 and IAS AC472 – the first fabricator in Asia to hold it. Thai projects get the same QA as our US and Australian work.

Erection-ready packages

Every piece is marked, bundled and loaded in erection sequence, with anchor-bolt plans sent before shipment so your foundations are ready when the steel arrives.

Fire protection that costs less

We size members and choose the coating together, cutting intumescent thickness – often the biggest hidden cost in a fire-rated steel building.

One price to your port or site

CIF or DDP: fabrication, packing, ocean freight, insurance and – for DDP – customs, duties and trucking in one transparent quotation.

Engineers who speak your project

English- and Thai-speaking support, drawings in Tekla and IFC models, and a single project manager from quotation to the last bolt.

ไทย

Thai craftsmanship, world-standard steel

Built for Thailand

We understand how Thailand builds

A building in Thailand is more than steel. It has to stand the monsoon, the sea air and the heat – and it begins with a ceremony. We plan for all of it.

  1. ๑

    Ready for your Sao Ek ceremony

    Tell us the auspicious date for your Yok Sao Ek (raising of the first column) and we schedule fabrication and shipping so the first column is on site and ready to lift.

  2. ๒

    Designed for the monsoon

    Wind loads to DPT 1311-50 and ASCE 7, with roof drainage and bracing sized for the south-west monsoon and tropical storms.

  3. ๓

    Protected against heat and sea air

    Paint and galvanising systems chosen for Thai humidity – up to C5 for coastal sites in Chonburi, Rayong, Songkhla and Phuket.

  4. ๔

    Planned around Thai holidays

    Vessels and port slots planned around Songkran, New Year and Chinese New Year, so your steel is never stuck at Laem Chabang over a long holiday.

World Steel Group

A steel group with Thai and international experience

World Steel Group designs, fabricates and exports steel structures from Vietnam to Thailand, the United States, Australia, Japan, Singapore and beyond. More than 100 projects in Thailand and work in over 12 countries have shaped one way of working: a professional team, a certified quality management system, and buildings that last.

We have completed hundreds of export projects and earned the trust of investors. With our motto “Building Trust, Assuring Success”, we stand beside our clients on their journey of sustainable development.

Nguyen Khanh Lam · Chairman of the Board, World Steel Group
Head officeHo Chi Minh City, Vietnam

Management, engineering, estimating and export sales

FactoryHai Son Industrial Park, Tay Ninh

20,000 m² fabrication plant, 2,000 t per month

USA officeWestminster, California

Representative office for North America

Thailand deskServing all 77 provinces

English- and Thai-speaking project support

  1. 2012World Steel Group founded in Ho Chi Minh City
  2. 201620,000 m² factory opens in Tay Ninh – 2,000 t/month
  3. 2019First exports to Thailand, the United States, Malaysia and Myanmar
  4. 2021First project in Australia
  5. 2024First project in Indonesia
  6. Today100+ projects in Thailand · IAS AC472 – first in Asia

A quality management system that makes buildings last

ISO 9001 · 14001 · 45001

Quality, environmental and occupational-safety management systems, certified and audited every year.

Independent QA/QC department

Inspectors report to quality management, not to production – nothing leaves the factory on schedule pressure alone.

Six inspection stages

Incoming material, cutting & drilling, assembly, welding, surface cleaning and painting – each signed off.

Hold tags & NCRs

Any non-conformity is tagged Hold and closed with a non-conformance report before the member moves on.

Traceable materials

Mill certificates for every heat; EN 10204 3.1, CE and JIS documentation on request.

Lasting performance

Correct welds, coating thickness and connections are what keep a steel building sound for decades in Thailand's climate.

Factory to site

Three to five days at sea from our factory to Laem Chabang

Our factory is about 100 km by road from Cai Mep – Vietnam’s deep-sea gateway with weekly direct sailings into the Gulf of Thailand. Steel reaches Laem Chabang, Bangkok Port, Map Ta Phut or Songkhla faster than many domestic mills can roll and fabricate it, and we have delivered to sites from Mae Sot and Khon Kaen down to Phuket and Hat Yai.

  • World Steel · Tay Ninh
  • Thai ports
  • Project locations
Prachinburi Pathum Thani Chumphon Hat Yai Phuket Mae Sot Khon Kaen Laem Chabang Bangkok Map Ta Phut Songkhla World Steel Cai Mep Gulf of Thailand 3–5 days at sea

From sketch to site

How a Thai project runs with World Steel

  1. 01

    Enquiry

    Send a layout, sketch or full drawings – plus site province, crane or mezzanine needs and preferred delivery term.

  2. 02

    Design & quotation in 48 h

    Preliminary design, steel weight, fire-protection option and CIF or DDP price within 48 hours for standard buildings.

  3. 03

    Approval drawings

    General arrangement, anchor-bolt plan and reactions for your Thai licensed engineer and building permit.

  4. 04

    Fabrication & QA

    Cutting, welding, blasting and painting in our 20,000 m² factory, with ITP inspection records for every lot.

  5. 05

    Packing & shipping

    Members marked and loaded in erection sequence – containers or flat racks – CIF to a Thai port or DDP to site.

  6. 06

    Erection support

    Erection drawings, bolt lists and remote engineering support for your Thai erection team; site supervision on request.

Your choice of Incoterm

CIF to the port, or DDP to your gate

CIF

To a Thai port

We deliver to a Thai port with freight and marine insurance paid. Your customs broker clears the cargo and trucks it to site – ideal when you already import regularly.

DDP

To your site, duties paid

We handle everything to your site: export, freight, insurance, Thai customs clearance, import duty and VAT, port charges and trucking. You receive steel, not paperwork.

CIF & DDP delivery

Fire safety, engineered

Fire-rated steel without the fire-rated price tag

Intumescent paint can cost as much as the steel it protects. We cut that cost at the design stage: choosing sections with a lower section factor, matching each member to the manufacturer’s assessed thickness tables and applying the coating in our factory, where thickness is controlled and recorded.

  • R30 – R120 fire resistance
  • Third-party assessed products (EN 13381-8, BS 476, UL 263)
  • Shop-applied, DFT recorded per member
  • Topcoats for humid and coastal Thai climates
Fire-protection paint

International

International steel structure projects

The same factory, the same engineers, the same standards – steel structures delivered to the USA, Australia, Singapore, Japan, the Philippines and beyond.

80 projects

Certified quality

The certifications behind every Thai project

  • IAS AC472IAS AC472
  • EN 1090 EXC3 · CEEN 1090 EXC3 · CE
  • ISO 3834-2ISO 3834-2
  • AS/NZS 5131 CC3AS/NZS 5131 CC3
  • ISO 9001ISO 9001
  • ISO 14001ISO 14001
  • ISO 45001ISO 45001

About

FAQ

Questions Thai clients ask us

Do you erect the building in Thailand?

We design, fabricate and deliver the steel structure and purlins. Erection is done by your Thai contractor or an erection team you appoint; we provide erection drawings, bolt lists and engineering support, and can send a site supervisor on request.

Can you supply roof and wall sheeting?

For Thailand we deliberately supply only the steel structure and purlins. Roof and wall sheets are best bought locally – we design purlin spacing and details to suit the Thai sheeting brand and profile you choose.

Which design standards do you use?

US codes by default (AISC 360, AISI S100, ASCE 7, MBMA), with wind and seismic loads checked against Thai DPT standards (มยผ. 1311-50 and มยผ. 1301/1302-61). Drawings are prepared so your Thai licensed engineer can review and sign them for the building permit.

How long does a project take?

For a standard warehouse, design and approval drawings take 1–3 weeks, fabrication 3–6 weeks depending on tonnage, and sea transit to Laem Chabang typically 3–5 days, plus customs clearance.

Is there import duty on steel structures from Vietnam?

Steel structures (HS 7308) made in Vietnam can qualify for ASEAN preferential duty under ATIGA when a Form D certificate of origin is issued – we provide it. VAT at 7% applies on import. Your customs broker confirms the final classification; on DDP terms we handle it for you.

What is the minimum order?

There is no fixed minimum – we have delivered 12 × 18 m stores as well as 300 m-long warehouses. Small orders are consolidated into shared containers to keep freight economical.

Send us your drawings – receive a priced steel package for Thailand

Structural design, fabrication, fire protection and CIF or DDP delivery in one quotation. Answer within 48 hours.

WhatsAppGet a quotation